Operations start at the Hannover Recyclables
Center (HWG)

Less than two years have passed since the groundbreaking ceremony in December 2020. Now, the Hagedorn Group of Companies opened the Hanover Recyclables Center (HWG) at the end of April. In the three recyclables halls with a total area of 13 000 m², 84 types of waste, including building materials and mineral waste, can be treated, recycled and disposed of. Hagedorn is thus putting another high-performance site into operation.

At the HWG, a maximum of waste is sent for
recycling
© Hagedorn

At the HWG, a maximum of waste is sent for
recycling
© Hagedorn
The Group is thus taking account of developments in society as a whole. After all, recycling management is also becoming increasingly important within the construction industry. Thanks to precise analyses of the specific waste quantities, the HWG enables a maximum of waste to be recycled and building materials to be efficiently recycled. In addition, the construction of the plant is the result of Hagedorn‘s very good growth, especially in the Hanover area, and underlines the group‘s ambitions for northern Germany. The operator of the plant is Hannoveraner Wertstoffzentrum GmbH, a company of the Hagedorn Group.

The Hanover recycling center is opened
© Hagedorn

The Hanover recycling center is opened
© Hagedorn
"With the new recyclables center, we are also increasing our capacities in northern Germany. This is important because Hagedorn, as an all-round service provider with comprehensive materials flow management, can thus provide valuable recycling capacities, and with the HWG we can not only cover our own needs but also meet all market requests from the Hanover region,“ explains Frank Röschard, HWG Managing Director.

Trimodal connection

The new recycling center is designed according to the latest standards and has a trimodal connection as a unique selling point: materials can be delivered by truck, rail or ship. This ensures efficient transport routes and makes an effective contribution to reducing traffic-related emissions.

In 2017, the Hagedorn Group took over the site on the county road, dismantled the buildings and revitalized the area. Previously, around 55 000 tons of high-performance carbon black were produced here at Misburger Hafen every year. For more than 20 years, the site served as a carbon black refinery for Columbian Carbon Deutschland GmbH. The opening of the new recycling center marks the beginning of a new era. The development of the site will be finalized in the third quarter of this year with the completion of the new administration and workshop of Hagedorn Hannover GmbH. The new headquarters for Hanover will be built on the 6000 m² neighboring property.

With the completed construction of the new recyclables center, the Hagedorn Group is taking another big step towards the future. "With the HWG, we are once again setting standards and making a further contribution to achieving our socially set sustainability goals 2030. Recycling is becoming the new norm and this is in line with our aspirations,“ says Alfred Winkelmann, Head of the Waste Management Division at the Hagedorn Group of Companies.

www.unternehmensgruppe-hagedorn.de

www.unternehmensgruppe-hagedorn.de

x

Related articles:

Issue 01/2022 Sorting challenge

Dry recyclables and light packaging

The recycling and waste disposal sector is in constant evolution, with an increasing degree of complexity and growing volumes. New regulations, policies and targets have been introduced across the...

more
Issue 02/2024 Closed loop

The next step in plastics recycling at Site Zero

Sweden is taking the next leap in plastic recycling and celebrated the extension of the Svensk Plaståtervinning polymer sorting plant. Originally opened in 2019, the plant was built in collaboration...

more
Issue 02/2020 New technology to Pier 96 Recycling Center 

The AI-powered robotic sorters increase recovery of recycled materials

Max-AI technology is supplied by Eugene, Oregon-based Bulk Handling Systems (BHS). The AQC units employ a camera-based vision system and Artificial Intelligence (AI) to identify recyclables and a...

more
Issue 01/2021 Maximum recycling

Wind turbines deserve green disposal

The dismantling of decommissioned wind turbines is currently a major issue. At the turn of the year, the 20-year subsidy under the Renewable Energy Sources Act (EEG) ended for around 5200 turbines,...

more
Issue 05/2023 Designed by STADLER Anlagenbau GmbH

Waste is turned into recyclables and solid secondary fuels

The Group operates five plants with the aim of returning waste into the production cycle, reducing the consumption of virgin raw materials and energy. To date, its plants have recovered over...

more